Time: 2017-02-17
In order to further strengthen the safety net management of construction safety net in linyi city and eliminate fire accidents and safety risks caused by unqualified safety net in construction projects, flame retardant safety net must be used in construction projects in linyi city since June 1, 2016.
Linyi construction in progress must use flame retardant safety net (dense mesh safety net and safety flat net), and safety performance testing, the city from June 1, 2016 to use (including new construction and construction of new use) new safety net. Before the safety net is put into use, it must be sent to the construction site under the supervision of the construction personnel or the supervising unit. Those that have not been tested or have failed the test shall not be used.
Before the safety net is put into use, it must be witnessed and submitted for inspection under the supervision of the construction site or the personnel of the supervising unit. If the quantity of each batch is less than or equal to 500 pieces, no less than 2 pieces of witness samples shall be submitted for inspection; If the quantity of each batch is more than 500 pieces, the witness sample shall be sent for inspection with no less than 4 pieces. Before the safety net is transferred to the next project for use, it must be re-tested and can be continued after passing the test.
The safety net is designed to prevent people from accidentally falling from high altitude. It is a mesh structure that can withstand strong gravity impact, protect the safety of workers, and prevent building impurities and wastes from falling from high altitude and injuring pedestrians and building objects. The safety net may be effective in preventing fire accidents.
At the same time, the safety net and safety net used on the construction site shall have the certificate of registration and filing of construction industrial products of shandong province, the safety mark of special labor protection articles, product qualification certificate, purchase contract and purchase invoice. The project department of a construction enterprise must promptly establish and improve safety net management files, which mainly include safety net use management registration ledger, product qualification certificate, purchase contract and purchase invoice, and inspection report after each batch enters the market.
The supervising unit shall, in accordance with the regulations on the administration of production safety of construction projects and relevant laws and regulations, do a good job in the witness submission and daily supervision of the safety net at the construction site, and regularly spot check the safety net management files and maintenance established by the project department of the construction unit. If it is found that the requirements are not met, it shall be ordered to make corrections immediately; Those who fail to make corrections as required shall promptly report to the local construction authorities.
Changchun yinghan new material technology co. LTD
Yinghan link exchange:http://www.ccyinghan.com
Telephone:0311-89299985 18032822116(Shijiazhuang) 0432- 65077017 13351516123 (Changchun)